ET6/10KRS PRO Online Long-Duration Lithium Battery UPS

6–10kVA online rack UPS purpose-engineered for long-duration lithium backup — single-phase or three-phase input, single-phase output.

ET6/10KRS PRO Series Product image
Appearance may vary by configuration; final specifications per quotation.
Brand
HighIdea
Type
Online double-conversion UPS (rack, long-duration)
Typical applications
Server rooms, data racks, telecom sites with long runtime needs
Models in range
ET6KRS PRO, ET10KRS PRO
Category
UPS Power Supply

The ET6/10KRS PRO series is HighIdea's answer for the 6–10kVA rack tier: a long-duration lithium platform with the input flexibility (1-phase or 3-phase in, 1-phase out) that real server rooms need, and the external battery architecture that turns runtime into a line item rather than a chassis limit.

Key Features

  • Dual-conversion online architecture with zero transfer time
  • Single-phase or three-phase input, single-phase output — fits sites with 3-phase supply and 1-phase racks
  • Long-duration external LiFePO4 battery configuration
  • DSP-controlled high-frequency conversion, pure sine wave output
  • Wide input voltage and frequency range for generator co-operation
  • Optional SNMP / Modbus / cloud monitoring

Specifications

Capacity6 / 10 kVA
TopologyOnline double conversion (VFI)
InputSingle-phase or three-phase option
BatteryExternal LiFePO4 packs
Output voltage220 / 230 / 240 Vac
Transfer time0 ms
Form factor19-inch rack-mount
CommunicationRS-232; optional SNMP / Modbus / cloud card

Specifications subject to the latest factory data. Final configuration is sized against the actual load, backup runtime and site power conditions — this table is for pre-selection only.

Applications

Small data centers

Three-phase input absorbs the full rack load while single-phase output feeds the servers directly.

Long-autonomy telecom hubs

Extended lithium runtime for hub sites where grid outages are long or generator start is unreliable.

FAQ

Why three-phase input on a single-phase output UPS?
Above roughly 5kVA, single-phase input currents become large and unbalance the supply. Three-phase input solves this on sites that have a 3-phase service feeding 1-phase racks.
How long can the backup time go?
Runtime scales with the number of LiFePO4 packs. Configurations of several hours at rated load are practical — tell us the target and we size it.

Related Models

Email Us WhatsApp